IBC and IFC Section 1024/1025 require luminous egress path markings in high-rise exit enclosures because they worked when everything else failed. PERMALIGHT wrote that record. Now we will do the takeoff for your project, free.
Prefer to talk? 888-737-6254, Monday to Friday, 8am to 5pm Pacific.
After the February 1993 bombing, the Port Authority evacuated 110-story towers through smoke-filled stairwells with failed emergency lighting. The retrofit that followed installed PERMALIGHT photoluminescent markings on the steps, landings, and handrail top bars of the World Trade Center emergency staircases.
On September 11, occupants again descended dozens of flights with power lost, lighting failed, and smoke in the enclosures. Electric emergency lighting is only as good as the circuit and battery feeding it. In a structural event, both can be gone in seconds.
The NIST World Trade Center Disaster Study found 33% of survivors in Tower 1 and 17% in Tower 2 reported the photoluminescent markings aided their evacuation. The markings needed no power. They had been charging from the stairwell lights every day for eight years.
IBC and IFC Chapter 10 require luminous egress path markings in Group A, B, E, I, M, and R-1 buildings with occupied floors more than 75 feet above the lowest level of fire department vehicle access, throughout all exit enclosures:
Adopted by all 50 states and D.C. through state and local code cycles; referenced by GSA, VA, DoD, and NPS. Enforced by building inspectors and fire code officials.
UL 1994 covers the marking, its luminance over time, washability, and the installation as a system. A roll of unlisted "glow" tape fails the first plan review.
PERMALIGHT supplies the correct luminance grade for the ambient light actually available in the stairwell, with documentation your AHJ can verify.
PERMALIGHT is written as basis of design in spec sections 10 144 (Photoluminescent Egress Path Markings) and 10 531 (Photoluminescent Signage) on projects across North America.

Send us the stair plan set. We return a complete UL 1994 egress marking takeoff within five business days.
Helpful to include: project name, building height, occupancy group, drawing stage, city, and the stair sheets (PDF).
Request My Free TakeoffExisting building? You do not need a site visit to find out where you stand. Send photos or a short walk-down video of one stairwell and we review it against current code.
Helpful to include: building address, number of stories, number of stairwells, and 6 to 10 photos per stair (treads, landing, handrail, door, any existing markings).
Request a Virtual Audit
Want your whole design team current on IBC/IFC 1025, UL 1994, and how to specify luminous egress markings correctly? We present a one-hour code-education session for architecture and engineering firms, in person or virtual.
Book a Lunch & LearnNot sure which offer fits? Call and describe the building. We will tell you whether 1025 applies, what the AHJ will look for, and what it will take to comply.
Send My Request